Material Inward to Dispatch

The complete manufacturing journey in a single flow. Material can enter the MES from three different sources, all of which converge at the same GRN Inspection. Once approved, it becomes a Batch or Work Order, moves serialized through the in-house operations, passes Final Inspection, and finally reaches Finished Goods. It is then dispatched to the customer — as a Customer Job Work Out for customer-supplied material, or on a Sales Invoice for company-owned (purchased or internally transferred) material. Quality control and traceability standards are identical regardless of how the material was sourced.

End-to-end process flow

Stage 1 — Material sources

Material enters from three sources, but the inward step is the only part that differs. Each ends with an entry on the Notification Screen.

RouteOriginReceived via
Customer Job WorkCustomer supplies the materialJob Work Inward DC
Supplier PurchaseProcured from an external supplierPurchase / GRN Entry (against Supplier PO)
Internal Material TransferProduced by an in-house Foundry / internal unitInternal Material Inward (via IMTO)

Stage 2 — Shared quality gate

Every inward entry — whatever the source — appears on the Notification Screen and is inspected on the same shared GRN Inspection screen. On rejection the material is held / returned; on approval it is released for production as a Batch or Work Order, and the system generates Serial Numbers based on the defined Control Plan and traceability requirements.

Stage 3 — In-house manufacturing (sequential)

Operations run strictly in order — each can begin only after the previous one is completed, so the status of every serialized part is tracked throughout the production lifecycle.

StepOperationPreconditionTraceability
1Operation 30Batch created & serial numbers generatedSerial number assigned and linked to Heat Code
2Operation 40Operation 30 completedSerial + heat code carried forward
3Operation 50Operation 40 completedSerial + heat code carried forward
4Final InspectionAll operations (30 → 40 → 50) completedFull serial-to-heat-code history verified
Outsourced operations

Any operation in the routing can be outsourced to an external supplier instead of running in-house — dispatched and received on Supplier Job Work Out/In DCs and validated by an Outsource Inspection. See the Supplier Job Work Process Flow.

Stage 4 — Completion & dispatch

Once Final Inspection is successfully completed and approved, the parts move to Finished Goods (FG) inventory. The outward transaction depends on how the material was originally sourced:

Original sourceMaterial ownershipOutward transaction
Customer Job WorkCustomer-suppliedCustomer Job Work Out — finished parts returned to the customer
Supplier PurchaseCompany-ownedSales Invoice — finished parts sold and dispatched to the customer
Internal Material TransferCompany-ownedSales Invoice — finished parts sold and dispatched to the customer

In every case the parts are dispatched to the customer with complete production and quality traceability from raw material through to the delivered part — only the commercial document differs: a Job Work Out returns customer-owned material, whereas an Invoice sells company-owned material.